Citation: | HE Xiao-mei, DONG Shao-hua. Research on rush order insertion rescheduling problem under hybrid flow shop with multi-objective and multi-constraint[J]. Chinese Journal of Engineering, 2019, 41(11): 1450-1457. doi: 10.13374/j.issn2095-9389.2018.11.27.002 |
[1] |
Gupta J N D. Two-stage, hybrid flowshop scheduling problem. J Operational Res Soc, 1988, 39(4): 359 doi: 10.1057/jors.1988.63
|
[2] |
Meng T, Pan Q K, Li J Q, et al. An improved migrating birds optimization for an integrated lot-streaming flow shop scheduling problem. Swarm Evolutionary Comput, 2018, 38: 64 doi: 10.1016/j.swevo.2017.06.003
|
[3] |
Rossi A. Flexible job shop scheduling with sequence-dependent setup and transportation times by ant colony with reinforced pheromone relationships. Int J Prod Economics, 2014, 153: 253 doi: 10.1016/j.ijpe.2014.03.006
|
[4] |
Yue L, Guan Z L, Zhang L, et al. Multi-objective lotsizing and scheduling with material constraints in flexible parallel lines using a Pareto based guided artificial bee colony algorithm. Comput Ind Eng, 2019, 128: 659 doi: 10.1016/j.cie.2018.12.065
|
[5] |
Qin H B, Fan P F, Tang H T, et al. An effective hybrid discrete grey wolf optimizer for the casting production scheduling problem with multi-objective and multi-constraint. Comput Ind Eng, 2019, 128: 458 doi: 10.1016/j.cie.2018.12.061
|
[6] |
Vieira G E, Herrmann J W, Lin E. Rescheduling manufacturing systems: a framework of strategies, policies, and methods. J Scheduling, 2003, 6(1): 39 doi: 10.1023/A:1022235519958
|
[7] |
Wu S D, Storer R H, Pei C C. One-machine rescheduling heuristics with efficiency and stability as criteria. Comput Operations Res, 1993, 20(1): 1 doi: 10.1016/0305-0548(93)90091-V
|
[8] |
Cui Z, Gu X S. A discrete group search optimizer for hybrid flow-shop scheduling problem with random breakdown. Math Probl Eng, 2014, 24: 621393
|
[9] |
Wang K, Choi S H. A decomposition-based approach to flexible flow shop scheduling under machine breakdown. Int J Prod Res, 2012, 50(1): 215 doi: 10.1080/00207543.2011.571456
|
[10] |
Gao K Z, Suganthan P N, Pan Q K, et al. Artificial bee colony algorithm for scheduling and rescheduling fuzzy flexible job shop problem with new job insertion. Knowledge-Based Syst, 2016, 109: 1 doi: 10.1016/j.knosys.2016.06.014
|
[11] |
Chiu Y F, Shih C J. Rescheduling strategies for integrating rush orders with preventive maintenance in a two-machine flow shop. Int J Prod Res, 2012, 50(20): 5783 doi: 10.1080/00207543.2011.627887
|
[12] |
Wang D J, Liu F, Wang J J, et al. Integrated rescheduling and preventive maintenance for arrival of new jobs through evolutionary multi-objective optimization. Soft Comput, 2016, 20(4): 1635 doi: 10.1007/s00500-015-1615-7
|
[13] |
裴海燕, 蔣祖華, 胡家文, 等. 插單擾動下流水線生產與維護的重調度優化. 工業工程與管理, 2017, 22(1):50
Pei H Y, Jiang Z H, Hu J W, et al. Integrating rescheduling with preventive maintenance in the flow-shop problem under rush order. Ind Eng Manage, 2017, 22(1): 50
|
[14] |
Deb K, Jain H. An evolutionary many-objective optimization algorithm using reference-point-based non-dominated sorting approach, Part I: solving problems with box constraints. IEEE Trans Evolutionary Comput, 2014, 18(4): 577 doi: 10.1109/TEVC.2013.2281535
|
[15] |
Qi X T, Bard J F, Yu G. Disruption management for machine scheduling: the case of SPT schedules. Int J Prod Economics, 2006, 103(1): 166 doi: 10.1016/j.ijpe.2005.05.021
|
[16] |
Govindan K, Jafarian A, Khodaverdi R, et al. Two-echelon multiple-vehicle location–routing problem with time windows for optimization of sustainable supply chain network of perishable food. Int J Prod Economics, 2014, 152: 9 doi: 10.1016/j.ijpe.2013.12.028
|