<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 40 Issue 9
Sep.  2018
Turn off MathJax
Article Contents
LI Guo-qing, HOU Jie, HU Nai-lian. Integrated optimization model for production and equipment dispatching in underground mines[J]. Chinese Journal of Engineering, 2018, 40(9): 1050-1057. doi: 10.13374/j.issn2095-9389.2018.09.005
Citation: LI Guo-qing, HOU Jie, HU Nai-lian. Integrated optimization model for production and equipment dispatching in underground mines[J]. Chinese Journal of Engineering, 2018, 40(9): 1050-1057. doi: 10.13374/j.issn2095-9389.2018.09.005

Integrated optimization model for production and equipment dispatching in underground mines

doi: 10.13374/j.issn2095-9389.2018.09.005
  • Received Date: 2018-04-16
  • Integrated optimization of production plays a key role in realizing short completion times of underground mine processes. To achieve the best production operation, a production plan should consider factors such as the working time and equipment capacity to arrange stope mining operations, equipment, and materials supply. Underground mining operation is a process with multiple working sites and multiple cycle operations, which include rock drilling, blasting, ventilation, supporting, ore-transportation, and backfilling. Once the stope mining begins, the above six steps must be intensively integrated to minimize the exposure time. Each step of stope mining has a significant effect on the whole mining plan; therefore, it is very important to form a reasonable configuration to achieve the mining plan target. The most difficult part of underground mining operation is how to organize the production process with limited resources (i. e., equipment and materials) to accomplish a large production task. In this paper, an integrated optimization model was described for compacting the integrated production process and efficiently dispatching production equipment. Two optimal objectives were combined to shorten the interval between production processes and overall working time. Production factors such as production cycle, type of operation equipment, and production capacity are analyzed in a mathematical model. In addition, the production safety was also considered and the time intervals between different working processes were considered to shorten the stope uncontrolled time to keep the production safety in the mathematical model. The best result of mining sequence and equipment dispatching was obtained by an improved genetic algorithm which searches the feasible solutions through primary-secondary two-step searching method. The model was validated in a large gold mine in China to work out the optimal equipment scheduling plan. The results show that compared with the traditional single-target optimization, the mining task can be accomplished effectively and the intervals between processes are minimized to improve safety in the mining operation.

     

  • loading
  • [13]
    Saayman F R, Craig P, Camisani-Calzolari I K. Optimization of an autonomous vehicle dispatch system in an underground mine. J South Afr Inst Min Metall, 2006, 106(2):77
    [14]
    O'Sullivan D, Newman A. Optimization-based heuristics for underground mine scheduling. Eur J Operat Res, 2015, 241(1):248
    [18]
    Topal J L E. Strategies to assist in obtaining an optimal solution for an underground mine planning problem using mixed integer programming. Int J Min Miner Eng, 2011, 3(2):152
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (813) PDF downloads(22) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频