<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 38 Issue S1
Jul.  2021
Turn off MathJax
Article Contents
HE Dong-feng, JIA Yong-wei. Thermoeconomic analysis on the converter-refining procedure based on the symbol exergy-economic model[J]. Chinese Journal of Engineering, 2016, 38(S1): 37-44. doi: 10.13374/j.issn2095-9389.2016.s1.007
Citation: HE Dong-feng, JIA Yong-wei. Thermoeconomic analysis on the converter-refining procedure based on the symbol exergy-economic model[J]. Chinese Journal of Engineering, 2016, 38(S1): 37-44. doi: 10.13374/j.issn2095-9389.2016.s1.007

Thermoeconomic analysis on the converter-refining procedure based on the symbol exergy-economic model

doi: 10.13374/j.issn2095-9389.2016.s1.007
  • Received Date: 2016-01-08
    Available Online: 2021-07-29
  • Taking the converter-refining procedure of a steel plant as an example,symbol exergy-economic model was established by the exergy-economic analysis method. Then the cost balance equation was constructed,and supplementary equations were established. The unit exergy price and thermal-economic cost of each exergy flow in the procedure were obtained on the converter-refining procedure through thermal-economic analysis. The results show that the thermoeconomic cost of per ton molten steel in the converterladle refine process is the lowest,which is 2243.12 RMB. The thermoeconomic cost of per ton molten steel in the converter-CAS refining process comes second,which is 2259.92 RMB. And the converter-RH refining process has the highest thermal-economic cost of per ton molten steel,which is 2270.16 RMB. From the standpoint of energy conservation and cost reduction,the converter-refining process is the reasonable process for SPHC steel production.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (337) PDF downloads(17) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频