<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 38 Issue 6
Jul.  2021
Turn off MathJax
Article Contents
ZHANG Yuan-sheng, GAO Yong-tao, WU Shun-chuan, ZHANG Tai-bao, TIAN Shu-guang. Post-construction settlement and creep law of waste dumps[J]. Chinese Journal of Engineering, 2016, 38(6): 745-753. doi: 10.13374/j.issn2095-9389.2016.06.001
Citation: ZHANG Yuan-sheng, GAO Yong-tao, WU Shun-chuan, ZHANG Tai-bao, TIAN Shu-guang. Post-construction settlement and creep law of waste dumps[J]. Chinese Journal of Engineering, 2016, 38(6): 745-753. doi: 10.13374/j.issn2095-9389.2016.06.001

Post-construction settlement and creep law of waste dumps

doi: 10.13374/j.issn2095-9389.2016.06.001
  • Received Date: 2016-01-01
    Available Online: 2021-07-22
  • The grain body creep of waste dumps including deceleration creep and constant creep was described by the Burgers model.Using the layered summation method,the vertical filling waste dump was sliced and the bottom part settled under the variable weight load of the overlaid part.The computational formulas of settlement in the waste dump filling dynamic process,post-construction settlement and cumulative settlement were derived from theoretical analysis though the steady and unsteady Burgers creep models.The monitoring data of Qidashan Iron Mine were used as a case of proofing.The results show that the correlation coefficients of fitting with both the unsteady and steady Burgers models are high,and the final settlement value of the former is 5.07 m,while the settlement curve of the latter is divergent,thus the unsteady Burgers model performs better in simulating the real working condition of mine subsidence.The waste dump was divided into ten layers and the settle rate of each layer was calculated by the creep simulation model in Flac3D.The post-construction settlement of the top layers is smaller than that of the middle layers and bottom layers,the settlement of the top layers decreases when getting closed to the upper surface of the waste dump.The settlement of the middle layers is larger than that of the bottom layers,and the fifth layer performs a largest settlement.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (432) PDF downloads(13) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频