<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 38 Issue 4
Jul.  2021
Turn off MathJax
Article Contents
HOU Jie, HU Nai-lian, LI Guo-qing, MA Chao-yang, LI Di, GONG Jian. Dynamic optimization of production plans for multi-metal underground mines[J]. Chinese Journal of Engineering, 2016, 38(4): 453-460. doi: 10.13374/j.issn2095-9389.2016.04.002
Citation: HOU Jie, HU Nai-lian, LI Guo-qing, MA Chao-yang, LI Di, GONG Jian. Dynamic optimization of production plans for multi-metal underground mines[J]. Chinese Journal of Engineering, 2016, 38(4): 453-460. doi: 10.13374/j.issn2095-9389.2016.04.002

Dynamic optimization of production plans for multi-metal underground mines

doi: 10.13374/j.issn2095-9389.2016.04.002
  • Received Date: 2015-12-10
    Available Online: 2021-07-10
  • In order to realize the dynamic and scientific optimization of production plans for multi-metal underground mines,we convert underground mining processes into a mathematic model constrained by several conditions to meet technical and economic requirements as well as spatial sequence relation,which aims to maximum profits. Operating units including cutting,blasting,mining and filling are treated as a whole process in the model. The underground mining condition of equilibrium and continuity is transformed into a space constraint. Considering the mining state of ore blocks as the decision variable,a model of production planning optimization is constructed by binary integer programming and calculated by an algorithm based on the artificial bee colony model. The optimization model was applied in a multi-metal underground mine in Tibet in southwestern China to optimize the production plan in the next three years which was illustrated by three-dimensional visualization display. The optimal solution indicated that the dynamic adjustment of the mining area could guarantee continuous production and increase the economic benefit of mine exploitation.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (419) PDF downloads(16) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频