LIU Yu, WANG Xu-dong, SHI Gui-qian, YAO Man, ZHANG Xiao-bing, NI Han-ping, LU Hong-zhou, WANG Xiong. Process factors of sticking breakout for wide and thick slab continuous casting[J]. Chinese Journal of Engineering, 2014, 36(6): 757-762. doi: 10.13374/j.issn1001-053x.2014.06.008
Citation:
|
LIU Yu, WANG Xu-dong, SHI Gui-qian, YAO Man, ZHANG Xiao-bing, NI Han-ping, LU Hong-zhou, WANG Xiong. Process factors of sticking breakout for wide and thick slab continuous casting[J]. Chinese Journal of Engineering, 2014, 36(6): 757-762. doi: 10.13374/j.issn1001-053x.2014.06.008
|
LIU Yu, WANG Xu-dong, SHI Gui-qian, YAO Man, ZHANG Xiao-bing, NI Han-ping, LU Hong-zhou, WANG Xiong. Process factors of sticking breakout for wide and thick slab continuous casting[J]. Chinese Journal of Engineering, 2014, 36(6): 757-762. doi: 10.13374/j.issn1001-053x.2014.06.008
Citation:
|
LIU Yu, WANG Xu-dong, SHI Gui-qian, YAO Man, ZHANG Xiao-bing, NI Han-ping, LU Hong-zhou, WANG Xiong. Process factors of sticking breakout for wide and thick slab continuous casting[J]. Chinese Journal of Engineering, 2014, 36(6): 757-762. doi: 10.13374/j.issn1001-053x.2014.06.008
|
Process factors of sticking breakout for wide and thick slab continuous casting
-
LIU Yu1
,
-
WANG Xu-dong1,2
,
,
,
-
SHI Gui-qian3
,
-
YAO Man1
,
-
ZHANG Xiao-bing2
,
-
NI Han-ping2
,
-
LU Hong-zhou2
,
-
WANG Xiong2
-
1. School of Materials Science and Engineering, Dalian University of Technology, Dalian 116024, China;
-
2. Jiangsu Shagang Group, Zhangjiagang 215625, China;
-
3. WISDRI Engineering & Research Incorporation Limited, Wuhan 430223, China
- Received Date: 2013-04-01
Available Online:
2021-07-10