<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 35 Issue 3
Jul.  2021
Turn off MathJax
Article Contents
WANG Chuang, LIU Qing, WANG Bin, WANG Bao, MU Yan-qing, XIE Fei-ming, WANG Bo-lin, LU Xin-chun, ZHANG Li-qiang, BAI Su-hong. Scheduling model of steelmaking-continuous casting processes in special steel plants[J]. Chinese Journal of Engineering, 2013, 35(3): 371-378. doi: 10.13374/j.issn1001-053x.2013.03.013
Citation: WANG Chuang, LIU Qing, WANG Bin, WANG Bao, MU Yan-qing, XIE Fei-ming, WANG Bo-lin, LU Xin-chun, ZHANG Li-qiang, BAI Su-hong. Scheduling model of steelmaking-continuous casting processes in special steel plants[J]. Chinese Journal of Engineering, 2013, 35(3): 371-378. doi: 10.13374/j.issn1001-053x.2013.03.013

Scheduling model of steelmaking-continuous casting processes in special steel plants

doi: 10.13374/j.issn1001-053x.2013.03.013
  • Received Date: 2012-02-23
  • A multi-objective scheduling model was developed to solve the steelmaking-continuous casting scheduling problem of a special steel plant.Static scheduling and dynamic scheduling were investigated in the solving process of the model.The production modes in static scheduling were classified and the corresponding solving methods were formulated in combination with the running principles of steelmaking workshops and on the basis of the operation cycles of steelmaking furnaces and casters,while time-adjusting methods based on scheduling rules were described for the process of dynamic scheduling.A case in a BOF special steel plant,in which three casters are producing at the same time,was used to test the methods,and the scheduling plans of three casts were calculated and compared with actual production data.The comparison result indicates the validity of the methods.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (232) PDF downloads(18) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频