WANG Hong-bing, XU An-jun, YAO Lin, TIAN Nai-yuan, DU Xi. Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting[J]. Chinese Journal of Engineering, 2010, 32(9): 1232-1237. doi: 10.13374/j.issn1001-053x.2010.09.023
Citation:
|
WANG Hong-bing, XU An-jun, YAO Lin, TIAN Nai-yuan, DU Xi. Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting[J]. Chinese Journal of Engineering, 2010, 32(9): 1232-1237. doi: 10.13374/j.issn1001-053x.2010.09.023
|
WANG Hong-bing, XU An-jun, YAO Lin, TIAN Nai-yuan, DU Xi. Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting[J]. Chinese Journal of Engineering, 2010, 32(9): 1232-1237. doi: 10.13374/j.issn1001-053x.2010.09.023
Citation:
|
WANG Hong-bing, XU An-jun, YAO Lin, TIAN Nai-yuan, DU Xi. Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting[J]. Chinese Journal of Engineering, 2010, 32(9): 1232-1237. doi: 10.13374/j.issn1001-053x.2010.09.023
|
Appling an improved genetic algorithm for solving the production scheduling problem of steelmaking and continuous casting
-
1. School of Information Engineering, University of Science and Technology Beijing, Beijing 100083, China;
-
2. School of Metallurgical and Ecological Engineering, University of Science and Technology Beijing, Beijing 100083, China;
-
3. School of Computer Science and Technology, Anhui University, Hefei 230601, China
- Received Date: 2009-10-21