<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 31 Issue 9
Aug.  2021
Turn off MathJax
Article Contents
YU Gang, TIAN Nai-yuan, XU An-jun. Computer-aided simulation of steelmaking-continuous casting production scheduling[J]. Chinese Journal of Engineering, 2009, 31(9): 1183-1188. doi: 10.13374/j.issn1001-053x.2009.09.014
Citation: YU Gang, TIAN Nai-yuan, XU An-jun. Computer-aided simulation of steelmaking-continuous casting production scheduling[J]. Chinese Journal of Engineering, 2009, 31(9): 1183-1188. doi: 10.13374/j.issn1001-053x.2009.09.014

Computer-aided simulation of steelmaking-continuous casting production scheduling

doi: 10.13374/j.issn1001-053x.2009.09.014
  • Received Date: 2008-10-17
    Available Online: 2021-08-09
  • Steelmaking-continuous casting production scheduling includes the drawing of a furnace charge plan and a cast plan,the allocation of time and equipments,and the dynamic adjustment to kinds of disturbances.An optimal furnace charge plan model was established based on the constraints of grade and specification and an algorithm with taboo search was used to solve the model.The cast plan was presented according to the furnace charge plan and the limitation of continuous casting.The principles of matching between converters and casters and minimizing the waiting time were used to draw the Gantt chart of static scheduling. A dynamic scheduling strategy and its algorithm were proposed for tapping tardiness in the simulation process. Simulation result shows that the strategy based on the model effectively solves the problem of tapping tardiness.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (226) PDF downloads(10) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频