<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 31 Issue 4
Aug.  2021
Turn off MathJax
Article Contents
ZHENG Zhong, ZHU Dao-fei, GAO Xiao-qiang. Production planning based on an ant colony algorithm for steel-making and continuous casting[J]. Chinese Journal of Engineering, 2009, 31(4): 504-510. doi: 10.13374/j.issn1001-053x.2009.04.016
Citation: ZHENG Zhong, ZHU Dao-fei, GAO Xiao-qiang. Production planning based on an ant colony algorithm for steel-making and continuous casting[J]. Chinese Journal of Engineering, 2009, 31(4): 504-510. doi: 10.13374/j.issn1001-053x.2009.04.016

Production planning based on an ant colony algorithm for steel-making and continuous casting

doi: 10.13374/j.issn1001-053x.2009.04.016
  • Received Date: 2008-03-02
    Available Online: 2021-08-09
  • An ant colony algorithm of self-organization resource allocation for dynamic procedure networks in production process was proposed to improve the validity of resource allocation in steel-making and continuous casting production planning. A production planning model for steel-making and continuous casting was established with sequence casting constraint. In the model, the objective is to minimize the operation conflict time and the queue waiting time and to start pouring early. The ant colony algorithm was designed on the base of the time and space reverse relation of structure of procedure networks in production process. The test with production data in a commercial steel plant shows that the model and algorithm can draw quickly a high-quality and performable production plan.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (125) PDF downloads(7) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频