<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 30 Issue 9
Aug.  2021
Turn off MathJax
Article Contents
LU Hongjian, GAO Yongtao, WU Shunchuan, PAN Guihao. Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining[J]. Chinese Journal of Engineering, 2008, 30(9): 967-971. doi: 10.13374/j.issn1001-053x.2008.09.001
Citation: LU Hongjian, GAO Yongtao, WU Shunchuan, PAN Guihao. Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining[J]. Chinese Journal of Engineering, 2008, 30(9): 967-971. doi: 10.13374/j.issn1001-053x.2008.09.001

Production capacity optimization of Shirengou Iron Mine during turning open pit into underground mining

doi: 10.13374/j.issn1001-053x.2008.09.001
  • Received Date: 2007-07-18
  • Rev Recd Date: 2007-10-17
  • Available Online: 2021-08-06
  • Rational determination of production capacity is one of the technical problems during turning open pit into underground mining. With Shirengou Iron Mine as the object, seven projects feasible in technology were brought forward in combination with its specific situation. Considering the integral effect of technical, economical and social factors on the production capacity and according to mining codes, standards and regulations, it is obtained by fuzzy comprehensive evaluation and analytic hierarchy process that the best production capacity of Shirengou Iron Mine during turning open pit into underground mining is 2 150 000 t·a-1.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (261) PDF downloads(8) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频