<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 29 Issue 3
Aug.  2021
Turn off MathJax
Article Contents
SONG Weidong, WANG Yongqing, MA Pengjiao, DU Jianhua, ZHANG Jiqing. Mechanical behavior investigation of the tunnel construction in metro line No.5 adjacent to Yuting Bridge in Beijing[J]. Chinese Journal of Engineering, 2007, 29(3): 251-255. doi: 10.13374/j.issn1001-053x.2007.03.002
Citation: SONG Weidong, WANG Yongqing, MA Pengjiao, DU Jianhua, ZHANG Jiqing. Mechanical behavior investigation of the tunnel construction in metro line No.5 adjacent to Yuting Bridge in Beijing[J]. Chinese Journal of Engineering, 2007, 29(3): 251-255. doi: 10.13374/j.issn1001-053x.2007.03.002

Mechanical behavior investigation of the tunnel construction in metro line No.5 adjacent to Yuting Bridge in Beijing

doi: 10.13374/j.issn1001-053x.2007.03.002
  • Received Date: 2005-12-26
  • Rev Recd Date: 2006-03-07
  • Available Online: 2021-08-16
  • The excavation process of the tunnel construction in metro line No. 5 adjacent to Yuting Bridge in Beijing was modeled by 3D-ANSYS numerical code. The influence of the excavation on the bridge's platform and ground environment was analyzed. The computed results were compared with measured data. It is shown that the influence of the excavation on the bridge's platform andground environment is in the range of the allowable value following the design. Any additional prior consolidating measure is not needed.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (186) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频