YANG Shuhua, ZHANG Xingmin, JIANG Fuxing, CHEN Qiang. Deep hole geophones and installing techniques used in microseismic monitoring underground[J]. Chinese Journal of Engineering, 2006, 28(1): 68-70,100. doi: 10.13374/j.issn1001-053x.2006.01.016
Citation:
|
YANG Shuhua, ZHANG Xingmin, JIANG Fuxing, CHEN Qiang. Deep hole geophones and installing techniques used in microseismic monitoring underground[J]. Chinese Journal of Engineering, 2006, 28(1): 68-70,100. doi: 10.13374/j.issn1001-053x.2006.01.016
|
YANG Shuhua, ZHANG Xingmin, JIANG Fuxing, CHEN Qiang. Deep hole geophones and installing techniques used in microseismic monitoring underground[J]. Chinese Journal of Engineering, 2006, 28(1): 68-70,100. doi: 10.13374/j.issn1001-053x.2006.01.016
Citation:
|
YANG Shuhua, ZHANG Xingmin, JIANG Fuxing, CHEN Qiang. Deep hole geophones and installing techniques used in microseismic monitoring underground[J]. Chinese Journal of Engineering, 2006, 28(1): 68-70,100. doi: 10.13374/j.issn1001-053x.2006.01.016
|
Deep hole geophones and installing techniques used in microseismic monitoring underground
-
1. Information Engineering School, University of Science and Technology Beijing, Beijing 100083, China;
-
2. College of Resources and Environmental Engineering, Shandong University of Science and Technology, Qingdao 266510, China;
-
3. Civil and Environmental Engineering School, University of Science and Technology Beijing, Beijing 100083, China;
-
4. Yanzhou Mining Group, Zoucheng 273500, China
- Received Date: 2004-11-09
- Rev Recd Date:
2005-04-26
Available Online:
2021-08-24