<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 44 Issue 2
Feb.  2022
Turn off MathJax
Article Contents
LIANG Peng, GAO Yong-tao, ZHOU Yu, DENG Dai-qiang. Determination method and engineering application of reasonable installation timing of the initial ground support[J]. Chinese Journal of Engineering, 2022, 44(2): 265-276. doi: 10.13374/j.issn2095-9389.2021.06.15.004
Citation: LIANG Peng, GAO Yong-tao, ZHOU Yu, DENG Dai-qiang. Determination method and engineering application of reasonable installation timing of the initial ground support[J]. Chinese Journal of Engineering, 2022, 44(2): 265-276. doi: 10.13374/j.issn2095-9389.2021.06.15.004

Determination method and engineering application of reasonable installation timing of the initial ground support

doi: 10.13374/j.issn2095-9389.2021.06.15.004
More Information
  • Corresponding author: E-mail: gaoyongt@vip.sina.com
  • Received Date: 2021-06-15
    Available Online: 2021-09-29
  • Publish Date: 2022-02-15
  • The surrounding rock support is a key issue in tunnel construction. The reasonable supporting time can not only ensure the safety of tunnel construction but also achieve the purpose of saving support costs. Currently, the support time determination mainly depends on on-site monitoring information and engineering experience, and there is still a lack of effective quantitative design methods. To overcome this deficiency, systematic research was conducted based on the case project of the Yudushan tunnel in the Yan-Chong expressway. The failure approach index was introduced in the tunnel support design, and the criterion of critical surrounding rock supporting time was defined. Based on the finite difference numerical calculation program and reasonable consideration of the post-peak strain softening characteristics of the rock mass, a method for determining an optimal tunnel supporting time was established. Through the analysis of numerical examples, the important parameters characterizing the supporting time were discussed quantitatively, and the essential significance of the supporting time was revealed from the engineering perspective. The results show that the supporting time increases by 8.32 m as the geological strength index is reduced from 75 to 25; the supporting time increases by 5.85 m as the intact rock material property, mi, is reduced from 20 to 10; the supporting time increases 3.74 m as the uniaxial compressive strength of rock, σci, is reduced from 80 to 40 MPa; the supporting time increases by 7.44 m as the engineering disturbance coefficient, D, is increased from 0 to 0.8. The proposed method was applied in the Yudushan tunnel project. The supporting time of the research section is 3.3 m. Field monitoring shows that the method is effective and feasible and provides a reference for the tunnel support system’s quantitative design.

     

  • loading
  • [1]
    陳建勛, 劉偉偉, 陳麗俊, 等. 綠泥石片巖地層大跨度公路隧道大變形控制及合理支護形式現場試驗. 中國公路學報, 2020, 33(12):212 doi: 10.3969/j.issn.1001-7372.2020.12.017

    Chen J X, Liu W W, Chen L J, et al. In-situ experimental study on large-deformation control and reasonable support forms for a large-span highway tunnel in chlorite schist. China J Highw Transp, 2020, 33(12): 212 doi: 10.3969/j.issn.1001-7372.2020.12.017
    [2]
    張頂立, 方黃城, 陳立平, 等. 隧道支護結構體系的剛度設計理論. 巖石力學與工程學報, 2021, 40(4):649

    Zhang D L, Fang H C, Chen L P, et al. Stiffness design theory for tunnel-support system. Chin J Rock Mech Eng, 2021, 40(4): 649
    [3]
    Tian X X, Song Z P, Zhang Y W. Monitoring and reinforcement of landslide induced by tunnel excavation: A case study from Xiamaixi tunnel. Tunn Undergr Space Technol, 2021, 110: 103796 doi: 10.1016/j.tust.2020.103796
    [4]
    孫振宇, 張頂立, 房倩, 等. 隧道支護結構體系協同優化設計方法及其應用. 巖土工程學報, 2021, 43(3):530

    Sun Z Y, Zhang D L, Fang Q, et al. Synergistic optimization design method for tunnel support structure system and its application. Chin J Geotech Eng, 2021, 43(3): 530
    [5]
    Su Y, Su Y H, Zhao M H, et al. Tunnel stability analysis in weak rocks using the convergence confinement method. Rock Mech Rock Eng, 2021, 54(2): 559 doi: 10.1007/s00603-020-02304-y
    [6]
    Kolymbas D. Tunnelling and Tunnel Mechanics: A Rational Approach to Tunnelling. Heidelberg: Springer Press, 2005
    [7]
    Feng J M, Yan C W, Ye L, et al. Evaluation of installation timing of initial ground support for large-span tunnel in hard rock. Tunn Undergr Space Technol, 2019, 93: 103087 doi: 10.1016/j.tust.2019.103087
    [8]
    張建海, 王仁坤, 周鐘, 等. 基于時效變形的脆性圍巖最優支護時機研究. 巖土工程學報, 2017, 39(10):1908 doi: 10.11779/CJGE201710020

    Zhang J H, Wang R K, Zhou Z, et al. Optimum support time of brittle underground cavern based on time-dependent deformation. Chin J Geotech Eng, 2017, 39(10): 1908 doi: 10.11779/CJGE201710020
    [9]
    孫振宇, 張頂立, 房倩, 等. 隧道初期支護與圍巖相互作用的時空演化特性. 巖石力學與工程學報, 2017, 36(增刊2): 3943

    Sun Z Y, Zhang D L, Fang Q, et al. Spatial and temporal evolution characteristics of interaction between primary support and tunnel surrounding rock. Chin J Rock Mech Eng, 2017, 36(Suppl 2): 3943
    [10]
    Zhang Y J, Su K, Qian Z D, et al. Improved longitudinal displacement profile and initial support for tunnel excavation. KSCE J Civ Eng, 2019, 23(6): 2746 doi: 10.1007/s12205-019-0411-9
    [11]
    張妍珺, 蘇凱, 周利, 等. 基于收斂-約束法的隧洞縱向變形演化規律研究與支護時機估算. 巖土力學, 2017, 38(增刊1): 471

    Zhang Y J, Su K, Zhou L, et al. Estimation of ground support installation time based on the tunnel longitudinal displacement of convergence-confinement method. Rock Soil Mech, 2017, 38(Suppl 1): 471
    [12]
    Zhang Y J, Su K, Zhu H Z, et al. Installation time of an initial support for tunnel excavation upon the safety factors of surrounding rock. Appl Sci, 2020, 10(16): 5653 doi: 10.3390/app10165653
    [13]
    Su K, Zhang Y J, Cui J P, et al. Installation time of ground support during tunnel excavation: A novel graph methodology. KSCE J Civ Eng, 2020, 24(12): 3866 doi: 10.1007/s12205-020-1079-x
    [14]
    蘇凱, 張妍珺, 伍鶴皋, 等. 隧洞開挖過程中圍巖安全系數演化特征與支護時機選擇方法研究. 巖石力學與工程學報, 2019, 38(增刊1): 2964

    Su K, Zhang Y J, Wu H G, et al. Evolution of surrounding rock safety factor and support installation time during tunnel excavation. Chin J Rock Mech Eng, 2019, 38(Suppl 1): 2964
    [15]
    楊建平, 陳衛忠, 郭小紅. 小凈距公路隧道支護時機對圍巖穩定性影響研究. 巖土力學, 2008, 29(2):483 doi: 10.3969/j.issn.1000-7598.2008.02.037

    Yang J P, Chen W Z, Guo X H. Effect of supporting time on stability of small spacing roadway tunnel. Rock Soil Mech, 2008, 29(2): 483 doi: 10.3969/j.issn.1000-7598.2008.02.037
    [16]
    崔嵐, 鄭俊杰, 章榮軍, 等. 彈塑性軟化模型下隧洞圍巖變形與支護壓力分析. 巖土力學, 2014, 35(3):717

    Cui L, Zheng J J, Zhang R J, et al. Study of support pressure and surrounding rock deformation of a circular tunnel with an elastoplastic softening model. Rock Soil Mech, 2014, 35(3): 717
    [17]
    張傳慶, 周輝, 馮夏庭. 基于破壞接近度的巖土工程穩定性評價. 巖土力學, 2007, 28(5):888 doi: 10.3969/j.issn.1000-7598.2007.05.008

    Zhang C Q, Zhou H, Feng X T. Stability assessment of rockmass engineering based on failure approach index. Rock Soil Mech, 2007, 28(5): 888 doi: 10.3969/j.issn.1000-7598.2007.05.008
    [18]
    裴峰. 紗嶺金礦深部地層巖體力學性能與深豎井圍巖穩定性分析及控制[學位論文]. 北京: 北京科技大學, 2020

    Pei F. Mechanical Properties of Rock in Deep Stratum and Analysis and Control of Shaft Surrounding Rock Stability in Shaling Gold Mine [Dissertation]. Beijing: University of Science and Technology Beijing, 2020
    [19]
    Zhang C Q, Zhou H, Feng X T. An index for estimating the stability of brittle surrounding rock mass: FAI and its engineering application. Rock Mech Rock Eng, 2011, 44(4): 401 doi: 10.1007/s00603-011-0150-9
    [20]
    孫振宇. 隧道支護體系協同作用原理與設計方法[學位論文]. 北京: 北京交通大學, 2020

    Sun Z Y. The Synergetic Principle and Design Method of Tunnel Support System [Dissertation]. Beijing: Beijing Jiaotong University, 2020
    [21]
    王東英, 湯華, 尹小濤, 等. 基于應變軟化的隧道錨漸進破壞過程探究. 巖石力學與工程學報, 2019, 38(增刊2): 3448

    Wang D Y, Tang H, Yin X T, et al. Preliminary study on the progressive failure of tunnel-type anchorage based on strain-softening theory. Chin J Rock Mech Eng, 2019, 38(Suppl 2): 3448
    [22]
    姜諳男, 張權, 許夢飛, 等. 基于Hoek-Brown準則的隧道圍巖改進單元安全度分析. 中國公路學報, 2020, 33(7):135 doi: 10.3969/j.issn.1001-7372.2020.07.014

    Jiang A N, Zhang Q, Xu M F, et al. Analysis of improved zone safety index of tunnel surrounding rock based on hoek-brown criterion. China J Highw Transp, 2020, 33(7): 135 doi: 10.3969/j.issn.1001-7372.2020.07.014
    [23]
    Zhao X G, Cai M. Influence of plastic shear strain and confinement-dependent rock dilation on rock failure and displacement near an excavation boundary. Int J Rock Mech Min Sci, 2010, 47(5): 723 doi: 10.1016/j.ijrmms.2010.04.003
    [24]
    Hoek E, Carranza T C, Corkum B. Hoek-Brown failure criterion—2002 edition // Proceedings of the North American Rock Mechanics Society NARMS-TAC. Toronto, 2002: 267
    [25]
    Cai M, Kaiser P K, Tasaka Y, et al. Determination of residual strength parameters of jointed rock masses using the GSI system. Int J Rock Mech Min Sci, 2007, 44(2): 247 doi: 10.1016/j.ijrmms.2006.07.005
    [26]
    Hoek E, Diederichs M S. Empirical estimation of rock mass modulus. Int J Rock Mech Min Sci, 2006, 43(2): 203 doi: 10.1016/j.ijrmms.2005.06.005
    [27]
    Wang F Y, Qian D L. Difference solution for a circular tunnel excavated in strain-softening rock mass considering decayed confinement. Tunn Undergr Space Technol, 2018, 82: 66 doi: 10.1016/j.tust.2018.08.001
    [28]
    Hoek E, Brown E T. Practical estimates of rock mass strength. Int J Rock Mech Min Sci, 1997, 34(8): 1165 doi: 10.1016/S1365-1609(97)80069-X
    [29]
    何川, 李永林, 林剛. 連拱隧道施工全過程三維有限元分析. 中國鐵道科學, 2005, 26(2):34 doi: 10.3321/j.issn:1001-4632.2005.02.007

    He C, Li Y L, Lin G. 3D FEM numerical analysis for the whole construction process of twin-bore tunnel. China Railw Sci, 2005, 26(2): 34 doi: 10.3321/j.issn:1001-4632.2005.02.007
    [30]
    蔚立元, 李術才, 徐幫樹. 青島小間距海底隧道施工優化的有限差分分析. 巖石力學與工程學報, 2009, 28(增刊2): 3564

    Yu L Y, Li S C, Xu B S. Finite difference analysis for construction optimization of little distance subsea tunnels in Qingdao city. Chin J Rock Mech Eng, 2009, 28(Suppl 2): 3564
    [31]
    劉小軍, 張永興. 淺埋偏壓隧道洞口段合理開挖工序及受力特征分析. 巖石力學與工程學報, 2011, 30(增刊1): 3066

    Liu X J, Zhang Y X. Analysis of reasonable excavation sequence and stress characteristics of portal section of shallow tunnel with unsymmetrical loadings. Chin J Rock Mech Eng, 2011, 30(Suppl 1): 3066
    [32]
    李術才, 朱維申, 陳衛忠, 等. 彈塑性大位移有限元方法在軟巖隧道變形預估系統研究中的應用. 巖石力學與工程學報, 2002, 21(4):466 doi: 10.3321/j.issn:1000-6915.2002.04.002

    Li S C, Zhu W S, Chen W Z, et al. Application of elasto-plastic large displacement finite element method to the study of deformation prediction of soft rock tunnel. Chin J Rock Mech Eng, 2002, 21(4): 466 doi: 10.3321/j.issn:1000-6915.2002.04.002
    [33]
    中華人民共和國交通運輸部. JTG/T3660—2020公路隧道施工技術規范. 北京: 人民交通出版社, 2020

    Ministry of Transport of the People’s Republic of China. JTG/T3660—2020 Code for Construction Technique of Highway Tunnel. Beijing: China Communications Press, 2020
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索

    Figures(11)  / Tables(1)

    Article views (805) PDF downloads(48) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频