Citation: | LIU Qing, LIU Qian, YANG Jian-ping, ZHANG Jiang-shan, GAO Shan, LI Qiang-du, WANG Bao, WANG Bai-lin, LI Tie-ke. Progress of research on steelmaking?continuous casting production scheduling[J]. Chinese Journal of Engineering, 2020, 42(2): 144-153. doi: 10.13374/j.issn2095-9389.2019.04.30.002 |
[1] |
殷瑞鈺. 關于智能化鋼廠的討論——從物理系統一側出發討論鋼廠智能化. 鋼鐵, 2017, 52(6):1
Yin R Y. A discussion on “smart” steel plant—view from physical system side. Iron Steel, 2017, 52(6): 1
|
[2] |
張春霞, 王海風, 張壽榮, 等. 中國鋼鐵工業綠色發展工程科技戰略及對策. 鋼鐵, 2015, 50(10):1
Zhang C X, Wang H F, Zhang S R, et al. Strategic study on green development of Chinese steel industry. Iron Steel, 2015, 50(10): 1
|
[3] |
吳秀麗, 孫樹棟, 楊展, 等. 多目標柔性Job Shop調度問題的技術現狀和發展趨勢. 計算機應用研究, 2007, 24(3):1 doi: 10.3969/j.issn.1001-3695.2007.03.001
Wu X L, Sun S D, Yang Z, et al. Survey on multi-objective flexible Job Shop scheduling problem. Appl Res Comput, 2007, 24(3): 1 doi: 10.3969/j.issn.1001-3695.2007.03.001
|
[4] |
鄭忠, 龍建宇, 高小強, 等. 鋼鐵企業以計劃調度為核心的生產運行控制技術現狀與展望. 計算機集成制造系統, 2014, 20(11):2660
Zheng Z, Long J Y, Gao X Q, et al. Present situation and prospect of production control technology focusing on planning and scheduling in iron and steel enterprise. Comput Integr Manuf Syst, 2014, 20(11): 2660
|
[5] |
王彬, 王闖, 王寶, 等. 煉鋼?連鑄過程生產計劃與調度問題綜合優化研究. 武漢科技大學學報, 2014, 37(3):161
Wang B, Wang C, Wang B, et al. Comprehensive optimization of production planning and scheduling for steelmaking-continuous casting process. J Wuhan Univ Sci Technol, 2014, 37(3): 161
|
[6] |
Tang L X, Liu J Y, Rong A Y, et al. A review of planning and scheduling systems and methods for integrated steel production. Eur J Oper Res, 2001, 133(1): 1 doi: 10.1016/S0377-2217(00)00240-X
|
[7] |
Touil A, Echchtabi A, Bellabdaoui A, et al. A hybrid metaheuristic method to optimize the order of the sequences in continuous-casting. Int J Ind Eng Comput, 2016, 7(3): 385
|
[8] |
Tang L X, Liu J Y, Rong A Y, et al. A mathematical programming model for scheduling steelmaking-continuous casting production. Eur J Oper Res, 2000, 120(2): 423 doi: 10.1016/S0377-2217(99)00041-7
|
[9] |
Pang X F, Gao L, Pan Q K, et al. A novel Lagrangian relaxation level approach for scheduling steelmaking-refining-continuous casting production. J Cent South Univ, 2017, 24(2): 467 doi: 10.1007/s11771-017-3449-1
|
[10] |
Cui H J, Luo X C. An improved Lagrangian relaxation approach to scheduling steelmaking-continuous casting process. Comput Chem Eng, 2017, 106: 133 doi: 10.1016/j.compchemeng.2017.05.026
|
[11] |
安玉偉, 嚴洪森. 一類兩階段生產系統生產計劃與調度的集成優化. 計算機集成制造系統, 2012, 18(4):796
An Y W, Yan H S. Integrated optimization for the production planning and scheduling in a two-stage production system. Comput Integr Manuf Syst, 2012, 18(4): 796
|
[12] |
Xu W J, Tang L X, Pistikopoulos E N. Modeling and solution for steelmaking scheduling with batching decisions and energy constraints. Comput Chem Eng, 2018, 116: 368 doi: 10.1016/j.compchemeng.2018.03.010
|
[13] |
劉光航, 李鐵克. 煉鋼?連鑄生產調度模型及啟發式算法. 系統工程, 2002, 20(6):44 doi: 10.3969/j.issn.1001-4098.2002.06.009
Liu G H, Li T K. A steelmaking-continuous casting production scheduling model and its heuristic algorithm. Syst Eng, 2002, 20(6): 44 doi: 10.3969/j.issn.1001-4098.2002.06.009
|
[14] |
馮振軍, 楊根科, 杜斌, 等. 煉鋼連鑄調度的啟發式和線性規劃兩步優化算法. 冶金自動化, 2005(4):18 doi: 10.3969/j.issn.1000-7059.2005.04.005
Feng Z J, Yang G K, Du B, et al. Two stage optimization algorithms based on heuristic and linear programming in continuous casting scheduling. Metall Ind Autom, 2005(4): 18 doi: 10.3969/j.issn.1000-7059.2005.04.005
|
[15] |
俞勝平, 柴天佑. 煉鋼?連鑄生產啟發式調度方法. 控制理論與應用, 2016, 33(11):1413
Yu S P, Chai T Y. Heuristic scheduling method for steelmaking and continuous casting production process. Control Theory Appl, 2016, 33(11): 1413
|
[16] |
Sampson J R. Adaptation in natural and artificial systems (John H. Holland). SIAM Rev, 1976, 18(3): 2
|
[17] |
Fujii S, Tanimoto S, Tomiyama S, et al. Genetic algorithm with reduction of search space using operational constraints and its application to scheduling system for steelmaking process. Tetsu-to-Hagané, 2003, 89(12): 1220 doi: 10.2355/tetsutohagane1955.89.12_1220
|
[18] |
徐兆俊, 鄭忠, 高小強. 煉鋼連鑄生產調度的優先級策略混合遺傳算法. 控制與決策, 2016, 31(8):1394
Xu Z J, Zheng Z, Gao X Q. HGA combined with priority strategy for production planning of steelmaking-continuous casting. Control Decision, 2016, 31(8): 1394
|
[19] |
袁帥鵬, 李鐵克, 王柏琳. 多目標煉鋼?連鑄生產調度的改進帶精英策略的快速非支配排序遺傳算法. 計算機集成制造系統, 2019, 25(1):115
Yuan S P, Li T K, Wang B L. Improved fast elitist non-dominated sorting genetic algorithm for multi-objective steelmaking-continuous casting production scheduling. Comput Integr Manuf Syst, 2019, 25(1): 115
|
[20] |
李鐵克, 蘇志雄. 煉鋼連鑄生產調度問題的兩階段遺傳算法. 中國管理科學, 2009, 17(5):68 doi: 10.3321/j.issn:1003-207X.2009.05.010
Li T K, Su Z X. Two-stage genetic algorithm for SM-CC production scheduling. Chin J Manage Sci, 2009, 17(5): 68 doi: 10.3321/j.issn:1003-207X.2009.05.010
|
[21] |
Dorigo M, Maniezzo V, Colorni A. Ant system: optimization by a colony of cooperating agents. IEEE Trans Syst Man Cyberne Part B Cybern, 1996, 26(1): 29 doi: 10.1109/3477.484436
|
[22] |
朱道飛, 鄭忠, 高小強. 煉鋼連鑄作業計劃的混合遺傳優化與仿真分析. 計算機工程與應用, 2010, 46(1):241 doi: 10.3778/j.issn.1002-8331.2010.01.072
Zhu D F, Zheng Z, Gao X Q. Hybrid genetic algorithm optimization-based production planning and simulation analysis for steelmaking and continuous casting. Comput Eng Appl, 2010, 46(1): 241 doi: 10.3778/j.issn.1002-8331.2010.01.072
|
[23] |
Fang Y D, Wang F, Wang H. Research of multi-objective optimization study for job shop scheduling problem based on grey ant colony algorithm. Adv Mater Res, 2011, 308-311: 1033
|
[24] |
薛云燦, 鄭東亮, 楊啟文. 基于改進離散粒子群算法的煉鋼連鑄最優爐次計劃. 計算機集成制造系統, 2011, 17(7):1509
Xue Y C, Zheng D L, Yang Q W. Optimum charge plan of steelmaking continuous casting based on the modified discrete particle swarm optimization algorithm. Comput Integr Manuf Syst, 2011, 17(7): 1509
|
[25] |
鄭鵬, 唐秋華, 張啟敏, 等. 基于離散粒子群算法的煉鋼連鑄生產調度. 機械設計與制造, 2016(7):49 doi: 10.3969/j.issn.1001-3997.2016.07.013
Zheng P, Tang Q H, Zhang Q M, et al. Discrete particle swarm optimization for steelmaking and continuous casting production. Mach Des Manuf, 2016(7): 49 doi: 10.3969/j.issn.1001-3997.2016.07.013
|
[26] |
Zarandi M H F, Dorry F. A hybrid fuzzy PSO algorithm for solving steelmaking-continuous casting scheduling problem. Int J Fuzzy Syst, 2018, 20(1): 219 doi: 10.1007/s40815-017-0331-0
|
[27] |
Pan Q K. An effective co-evolutionary artificial bee colony algorithm for steelmaking-continuous casting scheduling. Eur J Oper Res, 2016, 250(3): 702 doi: 10.1016/j.ejor.2015.10.007
|
[28] |
Peng K K, Pan Q K, Zhang B. An improved artificial bee colony algorithm for steelmaking-refining-continuous casting scheduling problem. Chin J Chem Eng, 2018, 26(8): 1727 doi: 10.1016/j.cjche.2018.06.008
|
[29] |
Glover F, Greenberg H J. New approaches for heuristic search: a bilateral linkage with artificial intelligence. Eur J Oper Res, 1989, 39(2): 119 doi: 10.1016/0377-2217(89)90185-9
|
[30] |
于港, 田乃媛, 徐安軍. 煉鋼?連鑄區段生產調度與計算機仿真. 北京科技大學學報, 2009, 31(9):1183
Yu G, Tian N Y, Xu A J. Computer-aided simulation of steelmaking-continuous casting production scheduling. J Univ Sci Technol Beijing, 2009, 31(9): 1183
|
[31] |
Zhang Q, Manier H, Manier M A. A genetic algorithm with tabu search procedure for flexible job shop scheduling with transportation constraints and bounded processing times. Comput Oper Res, 2012, 39(7): 1713 doi: 10.1016/j.cor.2011.10.007
|
[32] |
Kirkpatrick S, Gellatt C D, Vecchi M P. Optimisation by simulated annealing. Science, 1982, 220(4598): 671
|
[33] |
趙衛. 模擬退火遺傳算法在車間作業調度中的應用. 計算機仿真, 2011, 28(7):361 doi: 10.3969/j.issn.1006-9348.2011.07.090
Zhao W. Job-shop scheduling based on genetic algorithm and simulated annealing algorithm. Comput Simul, 2011, 28(7): 361 doi: 10.3969/j.issn.1006-9348.2011.07.090
|
[34] |
Shivasankaran N, Kumar P S, Raja K V. Hybrid sorting immune simulated annealing algorithm for flexible job shop scheduling. Int J Comput Intell Syst, 2015, 8(3): 455 doi: 10.1080/18756891.2015.1017383
|
[35] |
Yang Z, Qiu H L, Luo X W, et al. Simulating schedule optimization problem in steelmaking continuous casting process. Int J Simul Model, 2015, 14(4): 710 doi: 10.2507/IJSIMM14(4)CO17
|
[36] |
吳亞麗, 曾建潮, 衛軍胡, 等. 一種基于混合Petri網的批過程動態調度算法. 西安交通大學學報, 2002, 36(2):147 doi: 10.3321/j.issn:0253-987X.2002.02.010
Wu Y L, Zeng J C, Wei J H, et al. Dynamic scheduling algorithm for batch process systems based on hybrid Petri nets. J Xi'an Jiaotong Univ, 2002, 36(2): 147 doi: 10.3321/j.issn:0253-987X.2002.02.010
|
[37] |
Liao S H. Expert system methodologies and applications-a decade review from 1995 to 2004. Expert Syst Appl, 2005, 28(1): 93 doi: 10.1016/j.eswa.2004.08.003
|
[38] |
孫福權, 唐立新, 鄭秉霖. 煉鋼?連鑄生產調度專家系統. 冶金自動化, 1998(6):31
Sun F Q, Tang L X, Zheng B L. The steelmaking- continuous casting production schedulingbased on expert system. Metall Ind Autom, 1998(6): 31
|
[39] |
馬長波. 基于多智能體的煉鋼廠車間天車調度仿真方法研究[學位論文]. 昆明: 昆明理工大學, 2011
Ma C B. Research on the Simulation Methods of Crane Scheduling in Steel Plants Based on Multi-Agent [Dissertation]. Kunming: Kunming University of Science and Technology, 2011
|
[40] |
谷學靜, 朱朝月, 張建, 等. 多Agent蟻群算法求解煉鋼-連鑄動態調度問題. 科學技術與工程, 2016, 16(27):50 doi: 10.3969/j.issn.1671-1815.2016.27.009
Gu X J, Zhu Z Y, Zhang J, et al. Multi agent ant colony optimization for dynamic scheduling of steelmaking and continuous casting. Sci Technol Eng, 2016, 16(27): 50 doi: 10.3969/j.issn.1671-1815.2016.27.009
|
[41] |
孫玲, 劉繼超. 煉鋼−連鑄生產調度系統及應用// 中國計量協會冶金分會2013年會論文集. 濟南, 2013: 304
Sun L, Liu J C. Steelmaking−continuous casting production scheduling system and application // Proceedings of 2013 Annual Meeting of Metallurgical Branch of China Metrology Association. Jinan, 2013: 304
|
[42] |
Broner. Broner將向印度JSPL提供煉鋼廠最優化解決方案[EB/OL]. 新聞通訊[2019-04-30] https://max.book118.com/html/2017/0328/97503178.shtm
|
[43] |
劉曉強, 顧佳晨, 孫彥廣, 等. 鋼鐵企業MES中的計劃調度系統. 冶金自動化, 2004(1):22 doi: 10.3969/j.issn.1000-7059.2004.01.006
Liu X Q, Gu J C, Sun Y G, et al. Planning and scheduling system of MES in iron and steel industry. Metall Ind Autom, 2004(1): 22 doi: 10.3969/j.issn.1000-7059.2004.01.006
|
[44] |
龐新富, 俞勝平, 劉煒, 等. 煉鋼連鑄動態智能調度系統的研究與開發. 控制工程, 2005, 12(6):553 doi: 10.3969/j.issn.1671-7848.2005.06.013
Pang X F, Yu S P, Liu W, et al. Research and development of steelmaking and continuous casting dynamic intelligence scheduling system. Control Eng China, 2005, 12(6): 553 doi: 10.3969/j.issn.1671-7848.2005.06.013
|
[45] |
Numao M, Morishita S. Scheplan-a scheduling expert for steel-making process // Proceedings of theInternational Workshop on Artificial Intelligence for Industrial Applications. Hitachi City, 1988: 467
|
[46] |
王闖, 劉青, 王彬, 等. 特殊鋼廠煉鋼?連鑄調度模型. 北京科技大學學報, 2013, 35(3):371
Wang C, Liu Q, Wang B, et al. Scheduling model of steelmaking-continuous casting processes in special steel plants. J Univ Sci Technol Beijing, 2013, 35(3): 371
|
[47] |
王剛, 王彬, 王寶, 等. 基于“爐機對應”原則的煉鋼?連鑄調度模型. 北京科技大學學報, 2013, 35(8):1080
Wang G, Wang B, Wang B, et al. Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle. J Univ Sci TechnolBeijing, 2013, 35(8): 1080
|
[48] |
穆衍清, 尹佳, 謝飛鳴, 等. 特殊鋼廠爐機匹配研究. 北京科技大學學報, 2013, 35(1):126
Mu Y Q, Yin J, Xie F M, et al. Research on matching between furnaces and casters in special steel plants. J Univ Sci TechnolBeijing, 2013, 35(1): 126
|
[49] |
劉青, 田乃媛, 殷瑞鈺. 煉鋼廠系統的運行原則與調控策略. 過程工程學報, 2003, 3(2):171 doi: 10.3321/j.issn:1009-606X.2003.02.015
Liu Q, Tian N Y, Yin R Y. Operation principle and control strategy for steelmaking workshop system. Chin J Process Eng, 2003, 3(2): 171 doi: 10.3321/j.issn:1009-606X.2003.02.015
|
[50] |
劉青, 王彬, 汪宙, 等. 煉鋼廠的精益制造技術. 中國科技成果, 2014(11):78 doi: 10.3772/j.issn.1009-5659.2014.11.033
Liu Q, Wang B, Wang Z, et al. Lean manufacturing techniques in steel plants. China Sci Technol Achievements, 2014(11): 78 doi: 10.3772/j.issn.1009-5659.2014.11.033
|
[51] |
王彬. 長材型特殊鋼廠煉鋼?連鑄過程生產計劃優化與協同調度[學位論文]. 北京: 北京科技大學, 2015
Wang B. Optimal Planning and Collaborative Scheduling on Steelmaking-Continuous Cast Process in Special Steel Plants of Long Products [Dissertation]. Beijing: University of Science and Technology Beijing, 2015
|
[52] |
張春生, 李鐵克, 王柏琳, 等. 煉鋼機器故障下煉鋼?連鑄調度DCSP建模與算法. 計算機工程與應用, 2012, 48(22):226 doi: 10.3778/j.issn.1002-8331.2012.22.046
Zhang C S, Li T K, Wang B L, et al. Dynamic CSP-based modeling and algorithm of scheduling problem for steelmaking-continuous casting under steelmaking machine failures. Comput Eng Appl, 2012, 48(22): 226 doi: 10.3778/j.issn.1002-8331.2012.22.046
|
[53] |
王柏琳, 李鐵克, 張春生, 等. 基于動態約束滿足的考慮連鑄機故障的煉鋼連鑄調度算法. 計算機集成制造系統, 2011, 17(10):2185
Wang B L, Li T K, Zhang C S, et al. Dynamic CSP based scheduling algorithm for steelmaking and continuous casting with conticaster breakdown. Comput Integr Manuf Syst, 2011, 17(10): 2185
|
[54] |
王芊博, 張文新, 王柏琳, 等. 基于Agent的混合流水車間動態調度系統. 計算機應用, 2017, 37(10):2991 doi: 10.11772/j.issn.1001-9081.2017.10.2991
Wang Q B, Zhang W X, Wang B L, et al. Agent-based dynamic scheduling system for hybrid flow shop. J Comput Appl, 2017, 37(10): 2991 doi: 10.11772/j.issn.1001-9081.2017.10.2991
|
[55] |
Wang B L, Wang H F, Li T K. Design of a monitoring and rescheduling system for steelmaking-continuous casting production. Int J Performability Eng, 2018, 14(12): 3076
|