<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 39 Issue 3
Mar.  2017
Turn off MathJax
Article Contents
LI Guo-qing, LI Bao, HU Nai-lian, HOU Jie, XIU Guo-lin. Optimization model of mining operation scheduling for underground metal mines[J]. Chinese Journal of Engineering, 2017, 39(3): 342-348. doi: 10.13374/j.issn2095-9389.2017.03.004
Citation: LI Guo-qing, LI Bao, HU Nai-lian, HOU Jie, XIU Guo-lin. Optimization model of mining operation scheduling for underground metal mines[J]. Chinese Journal of Engineering, 2017, 39(3): 342-348. doi: 10.13374/j.issn2095-9389.2017.03.004

Optimization model of mining operation scheduling for underground metal mines

doi: 10.13374/j.issn2095-9389.2017.03.004
  • Received Date: 2016-10-10
  • To realize the accurate and scientific optimization of mining production scheduling for underground metal mines, a mathematic model based on 0-1 integer programming was constructed in view of the characteristics of mining process, such as decentralized production sites, complex production organization and difficulty in controlling the quality of the ore. After the requirements of economic index and spatial sequence relationship being analyzed, an optimization model was proposed which constrained by the yield balance, ore-drawing capacity and combination of high and low grade, aiming at the minimum grade deviation. The optimal mining schedule for underground mines was obtained by computer technology and integer programming to meet the operating procedure, mining sequence, production capacity and other factors. The optimization model was verified by a case in a large gold mine. The optimal solution, expressed by the Gantt chart, indicates that the model is not only meaningful to guide the completion of production tasks in underground mine operation scheduling, but also meets the requirements of continuity and equilibrium of operation scheduling.

     

  • loading
  • [1]
    Muller G. Systems engineering research methods. Procedia Comput Sci, 2013, 16:1092
    [2]
    Smartt C, Ferreira S. Applying systems engineering to survey research. Procedia Comput Sci, 2013, 16:1102
    [20]
    Nehring M, Topal E, Little J. A new mathematical programming model for production schedule optimization in underground mining operations. J S Afr Inst Min Metall, 2010, 110(8):437
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (700) PDF downloads(17) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频