<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 39 Issue 1
Jan.  2017
Turn off MathJax
Article Contents
REN Zhu-li, BI Lin, WANG Li-guan, CHEN Xin. Optimization of drawing scheduling based on mixed integer programming in block cave mining[J]. Chinese Journal of Engineering, 2017, 39(1): 23-30. doi: 10.13374/j.issn2095-9389.2017.01.003
Citation: REN Zhu-li, BI Lin, WANG Li-guan, CHEN Xin. Optimization of drawing scheduling based on mixed integer programming in block cave mining[J]. Chinese Journal of Engineering, 2017, 39(1): 23-30. doi: 10.13374/j.issn2095-9389.2017.01.003

Optimization of drawing scheduling based on mixed integer programming in block cave mining

doi: 10.13374/j.issn2095-9389.2017.01.003
  • Received Date: 2016-02-24
  • Drawing scheduling is the most important process in block cave mining. The traditional analysis process of drawing scheduling is random and inefficient without system scientific analysis. A mixed integer programming method was proposed in this paper to solve the optimization problem of drawing scheduling. Taking the ore reserve quantity, ore grade, drawing index and production scheduling index as the constraints and the grade fluctuation as the objective function, a drawing scheduling optimization model was built based on the mixed integer programming method. It was solved with the CPLEX solver invoked by model language that was programmed with YALMIP in MATLAB for a certain copper mine. Finally, the optimal arrangement scheme of drawing scheduling was obtained. It is proved that this model is scientific and feasible, the grade fluctuation reduces by 18%, and compared with the traditional, this drawing scheduling saves costs by meeting the desired production quantity more closely and reducing the employee time spent on preparing schedules.

     

  • loading
  • [3]
    Jolley D. Computer simulation of the movement of ore and waste in an underground mining pillar. Can Min Metall Bull, 1968, 61(675):854
    [4]
    Pourrahimian Y. Mathematical Programing for Sequence Optimization in Block Cave Mining[Dissertation]. Edmonton:University of Alberta, 2013
    [5]
    Pourrahimian Y, Askari-Nasab H, Tannant D. Mixed-integer linear programming formulation for block-cave sequence optimisation. Int J Min Miner Eng, 2012, 4(1):26
    [6]
    Pourrahimian Y, Askari-Nasab H. Block cave production scheduling optimization using mixed integer linear programming//Proceedings of 6th International Conference & Exhibition on Mass Mining. Sudbury, 2012
    [7]
    Pourrahimian Y, Askari-Nasab H, Tannant D. A multi-step approach for block cave production scheduling optimization. Int J Min Sci Technol, 2013, 23(5):739
    [8]
    Pourrahimian Y, Askeri-Nasab H. An application of mixed-integer linear programming for block-cave production scheduling//International Conference on Innovation in Mine Operations. Santiago, 2012:594
    [9]
    Diering T. Quadratic Programming applications to block cave scheduling and cave management//Proceedings MassMin Conference. Sudbury, 2012:6455
    [10]
    Rubio E, Diering T. Block cave production planning using operations research tools//Proceedings of Mass Mining. Santiago, 2004:141
    [11]
    Burgio N, Diering T. Simulating irregular cave propagation using PCBC//5th International Conference and Exhibition on Mass Mining. Lulea, 2008:1033
    [12]
    Rahal D C, Smith M L. A draw control system for scheduling production in block caving//MassMin 2004. Santiago, 2004:479
    [13]
    Parkinson A F. Essay on Sequence Optimization in Block Cave Mining and Inventory Policies with Two Delivery Sizes[Dissertation]. University of British Colombia, 2012
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (827) PDF downloads(14) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频