<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 38 Issue 11
Jul.  2021
Turn off MathJax
Article Contents
LI Qi-yue, LIU Kai, LI Xi-bing. Sublevel filling method for a heavy orebody in deep stoping based on collaborative[J]. Chinese Journal of Engineering, 2016, 38(11): 1515-1521. doi: 10.13374/j.issn2095-9389.2016.11.002
Citation: LI Qi-yue, LIU Kai, LI Xi-bing. Sublevel filling method for a heavy orebody in deep stoping based on collaborative[J]. Chinese Journal of Engineering, 2016, 38(11): 1515-1521. doi: 10.13374/j.issn2095-9389.2016.11.002

Sublevel filling method for a heavy orebody in deep stoping based on collaborative

doi: 10.13374/j.issn2095-9389.2016.11.002
  • Received Date: 2015-12-15
    Available Online: 2021-07-28
  • To solve the problems of the precontrol roof sublevel filling method in deep mining, such as the complexity of the excavation process of precontrol roadway roofs and the suseeptibility of precontrol roofs to blasting vibration, this article introduces a collaborative stoping based sublevel filling method which utilizes horizontal and vertical holes at the same time. The sublevel filling method can effectively solve the roof stability problem of surrounding rock through changing the precontrol roof into a rear control[roof by altering the support order. Furthermore, optimization research is performed on the sublevel filling method based on collaborative stoping:firstly, the structural parameters are optimized by stability analysis using SURPAC and ANSYS; then, the partition drawing and supporting method is applied to solve the problems of the poor support quality of the two sides and the inefficient ore-drawing. A case study of Xincheng Gold Mine shows that the displacement of the roof significantly decreases and the economic indicators:improve, indicating safe and high-efficient mining of the thick and large orebody under high geostress.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (276) PDF downloads(11) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频