<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 37 Issue 1
Jul.  2021
Turn off MathJax
Article Contents
BO Liang, LI Tie-ke, WANG Bo-lin, XU Shao-yun, DONG Guang-jing. Variable neighborhood search based multi-objective optimization method for batch scheduling of hot-rolled bars[J]. Chinese Journal of Engineering, 2015, 37(1): 111-117. doi: 10.13374/j.issn2095-9389.2015.01.017
Citation: BO Liang, LI Tie-ke, WANG Bo-lin, XU Shao-yun, DONG Guang-jing. Variable neighborhood search based multi-objective optimization method for batch scheduling of hot-rolled bars[J]. Chinese Journal of Engineering, 2015, 37(1): 111-117. doi: 10.13374/j.issn2095-9389.2015.01.017

Variable neighborhood search based multi-objective optimization method for batch scheduling of hot-rolled bars

doi: 10.13374/j.issn2095-9389.2015.01.017
  • Received Date: 2013-11-26
    Available Online: 2021-07-10
  • A batch scheduling problem of hot-rolled bars was discussed according to the influences of process conditions and due date on the continuous production of rolling units. A mathematical model with three objectives to minimize the setup time, tardiness penalty and steel grade bounce penalty was constructed, and a method of the variable neighborhood search algorithm embedding the earliest due date first (EDD) rule was proposed to solve the model. In consideration of constraints in the model, an initial solution was generated by constraint satisfaction technology. Then, to meet the actual production needs, a variable neighborhood search method was designed to minimize the setup time, which is considered as a primary objective. In this algorithm, a hybrid operator is applied in sha-king and local search, and the idea of simulated annealing is introduced to take control of the acceptance of new solutions. Meanwhile, in order to minimize the tardiness penalty and the steel grade bounce penalty, the earliest due date first rule and the steel grade sorting rule are applied. Experiment results show that the model and the algorithm are feasible and effective.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (259) PDF downloads(11) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频