<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 33 Issue 4
Jul.  2021
Turn off MathJax
Article Contents
YAO Gao-hui, WU Ai-xiang, WANG Yi-ming, XIA Hong-chun. Stability analysis of stope retention pillars in broken rock conditions[J]. Chinese Journal of Engineering, 2011, 33(4): 400-405. doi: 10.13374/j.issn1001-053x.2011.04.002
Citation: YAO Gao-hui, WU Ai-xiang, WANG Yi-ming, XIA Hong-chun. Stability analysis of stope retention pillars in broken rock conditions[J]. Chinese Journal of Engineering, 2011, 33(4): 400-405. doi: 10.13374/j.issn1001-053x.2011.04.002

Stability analysis of stope retention pillars in broken rock conditions

doi: 10.13374/j.issn1001-053x.2011.04.002
  • Received Date: 2010-03-18
    Available Online: 2021-07-30
  • Publish Date: 2021-07-30
  • After a proper engineering geological evaluation with rock mechanics rating(RMR) method,Q system and geological strength index(GSI),the mechanical parameters of rock masses were obtained by the extended Hoek-Brown failure criterion.According to the pillar layout of Baiyang ore section,a formula of pillar load was derived,and some parameters for calculating the pillar strength were also determined.The pillar instability mechanisms were respectively analyzed in view of main failure modes.Orthogonal design was introduced to optimization of the stope structure parameter.On this basis,the three-dimensional numerical simulation of each mining program was carried out.The sensitivity of influencing factors for pillar stability was assessed using the method of orthogonal range analysis.The practice shows that the stability of retention pillars can be safeguarded when the stope height is controlled in the range of 3.5 to 4.5 m,the stope width less than 5 m,and the pillar diameter not less than 3.5 m.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (304) PDF downloads(18) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频