<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 33 Issue 2
Jul.  2021
Turn off MathJax
Article Contents
WANG Jin-an, LI Da-zhong, SHANG Xin-chun. Mechanics analysis on creep fracture of strong roof strata above mined-out area[J]. Chinese Journal of Engineering, 2011, 33(2): 142-148. doi: 10.13374/j.issn1001-053x.2011.02.001
Citation: WANG Jin-an, LI Da-zhong, SHANG Xin-chun. Mechanics analysis on creep fracture of strong roof strata above mined-out area[J]. Chinese Journal of Engineering, 2011, 33(2): 142-148. doi: 10.13374/j.issn1001-053x.2011.02.001

Mechanics analysis on creep fracture of strong roof strata above mined-out area

doi: 10.13374/j.issn1001-053x.2011.02.001
  • Received Date: 2010-04-20
    Available Online: 2021-07-30
  • The deformation of roof strata supported by pillars in mined out area was analyzed in consideration of the rheological properties of rock masses and by utilizing the elastic-viscoelastic correspondence principle and numerical Laplace inversion. The roof deflection as a function of time was established, based on which the time-dependent behavior of the roof displacement was elaborated. It is shown that when rock creep properties are taken into account for both the pillars and roof, the roof displacement increases with pro-longing time as expected. Therefore, given a sufficient period of time, the roof deformation can reach a considerable magnitude even for hard rock masses and eventually lead to the collapse of roof strata. As a case, the estimation of failure time was carried out for Xingtai Gypsum Mine in China, in which the feasibility of the proposed method was verified by acceptable agreement between the estimated data and actual field observations.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (291) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频