<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 31 Issue 5
Aug.  2021
Turn off MathJax
Article Contents
CHEN Yu-min, HU Nai-lian, ZHENG Xiao-li, PAN Gui-hao. Technical-economic evaluation of low-grade resources and its application for gold mines[J]. Chinese Journal of Engineering, 2009, 31(5): 533-536,556. doi: 10.13374/j.issn1001-053x.2009.05.024
Citation: CHEN Yu-min, HU Nai-lian, ZHENG Xiao-li, PAN Gui-hao. Technical-economic evaluation of low-grade resources and its application for gold mines[J]. Chinese Journal of Engineering, 2009, 31(5): 533-536,556. doi: 10.13374/j.issn1001-053x.2009.05.024

Technical-economic evaluation of low-grade resources and its application for gold mines

doi: 10.13374/j.issn1001-053x.2009.05.024
  • Received Date: 2008-10-28
    Available Online: 2021-08-09
  • A technical and economic evaluation model for low-grade resources in Jiaojia Gold Mine was built up based on the breakeven theory. In different production stages, the corresponding follow-up cost was calculated, based on which the low grade resources were evaluated and classified. Differential grades were calculated to determine whether it is worthy to recovery them. The threedimensional deposit model in combination with Supac software was adopted to estimate and evaluate low-grade mineralized deposits in Jiaojia Gold Mine. Given the gold price of RMB ¥ 180 g-1, the application of differential grade can bring the mine additional 2.73 t gold metals, as well as RMB ¥ 7 500 million profits.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (159) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频