<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 29 Issue 7
Aug.  2021
Turn off MathJax
Article Contents
YE Genxi, JIANG Fuxing, LIU Pengliang, FENG Zengqiang, WANG Daozong. Design and optimization of the mining method of boundary coal-pillars with high recovery ratio and high efficiency[J]. Chinese Journal of Engineering, 2007, 29(7): 655-659. doi: 10.13374/j.issn1001-053x.2007.07.002
Citation: YE Genxi, JIANG Fuxing, LIU Pengliang, FENG Zengqiang, WANG Daozong. Design and optimization of the mining method of boundary coal-pillars with high recovery ratio and high efficiency[J]. Chinese Journal of Engineering, 2007, 29(7): 655-659. doi: 10.13374/j.issn1001-053x.2007.07.002

Design and optimization of the mining method of boundary coal-pillars with high recovery ratio and high efficiency

doi: 10.13374/j.issn1001-053x.2007.07.002
  • Received Date: 2006-02-15
  • Rev Recd Date: 2006-04-05
  • Available Online: 2021-08-16
  • Based on the simplified plane shape, a new mining design and optimization method for recovering boundary coal-pillars, called arc-face mining method, was presented. Its advantages are as follows:easy to choose the related comprehensive auxiliary equipment, high recovery ratio and efficiency, and fitting the fully mechanized coal mining technology, even the sub-level longwall eaving face technology when the geologic condition is permitted. The key techniques include:developing a series of underground chambers along tailgate; in a chamber, storing some supports which will be added to the coming face-supports when the face advances near the chamber; canceling face-end supports and adopting a simple conveyer in order to add or remove supports quickly. Then, with the linear mathematics programming theory, the objective function of recovery efficiency and the constraint functions of safety and exploitation cost were established. It is concluded that the increased number of supports each time not only affects the number of underground chambers but also the efficiency. The optimization analysis also provides various optimal technology schemes with the principle of higher efficiency or lower cost.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (224) PDF downloads(7) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频