<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 27 Issue 2
Aug.  2021
Turn off MathJax
Article Contents
HE Dongfeng, TIAN Naiyuan. Continuous casting and rolling process scheduling system of two-strand thin slabs based on hybrid genetic algorithm[J]. Chinese Journal of Engineering, 2005, 27(2): 240-244. doi: 10.13374/j.issn1001-053x.2005.02.058
Citation: HE Dongfeng, TIAN Naiyuan. Continuous casting and rolling process scheduling system of two-strand thin slabs based on hybrid genetic algorithm[J]. Chinese Journal of Engineering, 2005, 27(2): 240-244. doi: 10.13374/j.issn1001-053x.2005.02.058

Continuous casting and rolling process scheduling system of two-strand thin slabs based on hybrid genetic algorithm

doi: 10.13374/j.issn1001-053x.2005.02.058
  • Received Date: 2004-05-23
  • Rev Recd Date: 2005-01-17
  • Available Online: 2021-08-17
  • Schedule rules for two-strand thin slab casting and rolling were established. Based on the characteristic of the casting and rolling process, a kind of coding, crossover operator, mutation operator and the concept of amendment operator for the genetic algorithm were proposed. In the genetic algorithm, the schedule rules were introduced into the modeling of initial population and the operation of amendment. A scheduling system of two-strand thin slab casting and rolling was developed by using the schedule rules and the genetic algorithm. This system can solve the dynamic schedule problem of two-strand thin slab casting and rolling and optimize production management.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142