<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 27 Issue 1
Aug.  2021
Turn off MathJax
Article Contents
MA Dangxian, MU Zhichun, WANG Shaobo, WANG Zhangsong. Application of CBR and KDD techniques to modeling plate rolling schedules[J]. Chinese Journal of Engineering, 2005, 27(1): 98-101. doi: 10.13374/j.issn1001-053x.2005.01.025
Citation: MA Dangxian, MU Zhichun, WANG Shaobo, WANG Zhangsong. Application of CBR and KDD techniques to modeling plate rolling schedules[J]. Chinese Journal of Engineering, 2005, 27(1): 98-101. doi: 10.13374/j.issn1001-053x.2005.01.025

Application of CBR and KDD techniques to modeling plate rolling schedules

doi: 10.13374/j.issn1001-053x.2005.01.025
  • Received Date: 2003-10-03
  • Rev Recd Date: 2004-03-10
  • Available Online: 2021-08-17
  • In order to develop an adaptive model for automatically generating rolling schedules that comply with practical operations in heavy plate rolling, the techniques of Case-Based Reasoning (CBR) and Knowledge Discovery in Database (KDD) are introduced in the modeling process. In the model CBR not only is used for storing and retrieving the cases, i.e. schedules by which high-quality products have been rolled, but also generates an initial schedule for the material to be rolled according to the similarity in attributes between the material and the stored cases. KDD is introduced to find the rules from the operational data records to modify the initial schedule if there is difference between the ongoing rolling practice and the case applied. The experimental results of comparing the schedules against the practical rolling data show that the schedule generated by the new model is more reasonable and conformable to the actual rolling practice than that generated by traditional methods, which indicates that the method proposed in this paper is a promising method for rolling schedule generation modeling.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (167) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频