CAO Jianguo, ZHANG Jie, CHEN Xianlin, WEI Gangcheng, HUANG Siqing, XIN Weimin. Gain Scheduling Decoupling Control for the Combined Shape and Gauge Control System in Hot Strip Mills[J]. Chinese Journal of Engineering, 2003, 25(4): 358-361. doi: 10.13374/j.issn1001-053x.2003.04.017
Citation:
|
CAO Jianguo, ZHANG Jie, CHEN Xianlin, WEI Gangcheng, HUANG Siqing, XIN Weimin. Gain Scheduling Decoupling Control for the Combined Shape and Gauge Control System in Hot Strip Mills[J]. Chinese Journal of Engineering, 2003, 25(4): 358-361. doi: 10.13374/j.issn1001-053x.2003.04.017
|
CAO Jianguo, ZHANG Jie, CHEN Xianlin, WEI Gangcheng, HUANG Siqing, XIN Weimin. Gain Scheduling Decoupling Control for the Combined Shape and Gauge Control System in Hot Strip Mills[J]. Chinese Journal of Engineering, 2003, 25(4): 358-361. doi: 10.13374/j.issn1001-053x.2003.04.017
Citation:
|
CAO Jianguo, ZHANG Jie, CHEN Xianlin, WEI Gangcheng, HUANG Siqing, XIN Weimin. Gain Scheduling Decoupling Control for the Combined Shape and Gauge Control System in Hot Strip Mills[J]. Chinese Journal of Engineering, 2003, 25(4): 358-361. doi: 10.13374/j.issn1001-053x.2003.04.017
|
Gain Scheduling Decoupling Control for the Combined Shape and Gauge Control System in Hot Strip Mills
-
1. Mechanical Engineering School, University of Science and Technology Beijing, Beijing 100083, China;
-
2. Hot Strip Mill Plant, Wuhan Iron and Steel Company, Wuhan 430083, China
- Received Date: 2002-09-18
Available Online:
2021-08-17