<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 17 Issue 1
Sep.  2021
Turn off MathJax
Article Contents
Wang Jiachen, Liu Qi. Study of the Rational Bench Height of Deep Open Pit Mines Based on Transportation Cost[J]. Chinese Journal of Engineering, 1995, 17(1): 14-18,40. doi: 10.13374/j.issn1001-053x.1995.01.004
Citation: Wang Jiachen, Liu Qi. Study of the Rational Bench Height of Deep Open Pit Mines Based on Transportation Cost[J]. Chinese Journal of Engineering, 1995, 17(1): 14-18,40. doi: 10.13374/j.issn1001-053x.1995.01.004

Study of the Rational Bench Height of Deep Open Pit Mines Based on Transportation Cost

doi: 10.13374/j.issn1001-053x.1995.01.004
  • Received Date: 1994-05-10
    Available Online: 2021-09-06
  • The effect of bench height on open pit mining is studied.The rational bench height is proposed on the principle of that the comprehensive present value of transportation cost, maitaining and building transportation road cost and maintaining final wall bench cost is minimum.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (255) PDF downloads(5) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频