Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011
Citation:
|
Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011
|
Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011
Citation:
|
Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011
|
Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine
-
1. Department of Mechanical Engineering, USTB, Beijing 100083, PRC;
-
2. General Machanial Factory of Wuhan Iron & Steel Co, Wuhan 430083, PRC
- Received Date: 1993-12-21
Available Online:
2021-11-13