<listing id="l9bhj"><var id="l9bhj"></var></listing>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<cite id="l9bhj"><strike id="l9bhj"></strike></cite>
<var id="l9bhj"></var><cite id="l9bhj"><video id="l9bhj"></video></cite>
<menuitem id="l9bhj"></menuitem>
<cite id="l9bhj"><strike id="l9bhj"><listing id="l9bhj"></listing></strike></cite><cite id="l9bhj"><span id="l9bhj"><menuitem id="l9bhj"></menuitem></span></cite>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"></var>
<var id="l9bhj"><strike id="l9bhj"></strike></var>
<ins id="l9bhj"><span id="l9bhj"></span></ins>
Volume 16 Issue 6
Nov.  2021
Turn off MathJax
Article Contents
Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011
Citation: Gao Lixin, Fan Yumei, Xu Jinwu, Yang Huanxi. Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine[J]. Chinese Journal of Engineering, 1994, 16(6): 556-560. doi: 10.13374/j.issn1001-053x.1994.06.011

Fuzzy Plan of the Time-Cost Analysis for Network Plan of Manufacture of Continuous casting machine

doi: 10.13374/j.issn1001-053x.1994.06.011
  • Received Date: 1993-12-21
    Available Online: 2021-11-13
  • The paper presents the fuzzy plan of the time-cost analysis for network plan which on work in running and debugging on the computer.The calculating indicates that the optimization result of the algorithim makes the ampledecision room to the planner.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (222) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    久色视频