Hot Metal Supply Impactd on Converter Layout
-
摘要: 在實測和解析某鋼廠2座和3座轉爐并排布置時的鐵水包作業過程時間的基礎上,提出了3座和2座轉爐并排布置時,鐵水供應的限制性環節;說明3座轉爐并排布置不適應快速轉爐的生產要求,計算在不同限制環節下,單座轉爐的最大年生產能力.同時計算了日本新型轉爐群布置的年生產能力,探討了其對高速連鑄的適應性.Abstract: The process time of hot metal ladle was measured and analyzed, and the neck of hot metal supply was pointed out when two or three converters are located in one line. The most annual capacity of one converter was calculated in different neck. The result is that three converters located in one line are not suitable for the production demand of fast converter In the meantime, anneal capacity is calculated, and the adaptability is discussed to the higher speed continuous casting about new converters layout in Japan. The references are provided for enterprise alteration in our country.
-
Key words:
- converter /
- layout /
- production capacity
-