Visual Works Structure Tree of the Mine Construction Project
-
摘要: 提出項目結構樹概念,用項目結構樹模型描述礦山建設項目任務的層次結構及其工作參數.應用數據結構理論和VisualBasic編程技術,研究項目結構樹的生長算法,構造可視化項目結構樹.以可視化項目結構樹為基礎,提出一種新的計劃編制方法.Abstract: The project structure tree is defined to describe the works structure and the work parameters of mine construction project. By making use of data structure theory and programming technology of Visual Basic, the growing algorithm of the project structure tree is researched, and the visual tree is built up. A new plannig method is put forward on the basis of visual project tree.
-
Key words:
- computer /
- mine /
- construction project
-

計量
- 文章訪問數: 219
- HTML全文瀏覽量: 74
- PDF下載量: 7
- 被引次數: 0